메뉴 바로가기
주메뉴 바로가기
컨텐츠 바로가기
Performance
  • HOME   >
  • Performance Capability  >
  • Performance
Period Project Owner
2023.01 ~ Present NDE Service HYUNDAI OILBANK
2023.01 ~ Present NDE Service HYUNDAI CHEMICAL
2023.01 ~ Present NDE Service HYUNDAI and SHELL BASE OIL
2023.01 ~ Present NDE Service HYUNDAI COSMO PETROCHEMICAL
2020.02 ~ 2022.04 HPC PROJECT(PACKAGE-1), NDE Area 5 HYUNDAI E&C
2019.12 ~ 2020.10 HDO 2020 Revamping Project HYUNDAI OIL BANK
2018.04 ~ 2018.10 2018 HDO Revamping Project HYUNDAI OIL BANK
2017.06 ~ 2017.07 Corrosion Inspection for Lower Part of Oil Pipe of First Basement in Geoje KOREA NATIONAL OIL CORPORATION
2017.06 ~ 2018.10 Propane Lower-Temperature Tank Construction in Daesan E1 / POSCO E&C
2017.05 ~ 2017.12 2017 HDO Revamping Project HYUNDAI OIL BANK
2017.01 ~ 2017.07 RUC Project - Pipe NDE in Manufacturing Shop S-OIL / SAMSUNG C&T
2016.10 ~ 2016.12 PIA2 E-7302 He Leak Test LOTTE CHEMICAL
2016.04 ~ 2016.08 Gwangyang Plant Maintenance Construction (IRIS) POSCO
2015.12 ~ 2017.12 Hyosung Yonghyeon Plant Annual Maintenance HYOSUNG
2015.10 ~ 2016.10 Daesan Hyundai Chemical MX Project HYUNDAI E&C / LOTTE E&C
2015.01 ~ 2016.03 Ulsan SMP Annual Maintenance SMP
2014.07 ~ 2016.03 Ulsan SK GAS P-Project SK E&C
2013.01 ~ 2015.12 Gunsan OCI Annual Maintenance OCI
2010.04 ~ 2010.12 Gunsan OCI P3 Project ETEC E&C
2010.03 ~ 2013.07 Yeosu Oil Tank Construction HYUNDAI E&C
2008.08 ~ 2009.05 Gunsan OCI P2 Project ETEC E&C
2006.12 ~ 2008.04 SK Enhanced Facilities Construction HYUNDAI E&C

Contact us

We will do our best to provide you with the fastest and most satisfying answer to your inquiry or request